Lumberton

Intermediate

Lumberton ISD

Scope of Services

Lumberton Intermediate transformed an aged existing middle school into a modern 148,000-square-foot campus for grades 3–5, designed for future growth. The new campus brings together new and existing spaces creating light-filled classrooms, a media center, gym, cafeteria with performance stage, outdoor seating, and additional parking for a cohesive 21st-century learning environment. The library serves as a hub for collaboration, with movable furnishings, robotics tables, and flexible spaces for class or project work, anchored by a mural celebrating education, Raiders sports, and Southeast Texas. Bright, modern spaces and school colors throughout inspire students while connecting the building to its community and identity.

=

Contractor

Daniels Building & Construction, Inc.
=

Square footage

New Construction: 74,446 sq. ft.
Overall Size: 148,000 sq. ft.

=

Completion Date

August 2023

=

Construction Cost

$28,370,353