Malakoff

high School

Malakoff ISD

Scope of Services

This 187,009 square foot, two story high school was designed to support academics, career and technical education, and student life in one cohesive campus. The facility features two academic wings anchored by shared spaces including a media center, auditorium, and a competition gym that also serves as a storm shelter.

Specialized learning environments include science labs, culinary arts, horticulture and floral design, welding labs, a band hall, and an agricultural shop, providing students with hands on learning opportunities. Exterior amenities include a greenhouse and a synthetic turf practice area for the band.

=

Contractor

Jackson Construction

=

Square footage

187,009 Sq. Ft.

=

Completion Date

August 2024

=

Construction Cost

$68,977,375